Project Overview
The Genentech “Rituxan Recover All” project consisted of replacing the existing 4000L pool tanks with new 8000L AL6XN tanks in the recovery and final purification cGMP suites. Due to ongoing campaigns, the project construction was limited to two separate shutdowns, each approximately two weeks in duration, 24/7. Phase 1 required relocating MEP utilities and many validated systems to accommodate raising the existing clean room systems to a 26′ clear.